The factories of Hoa Sen Group have many lines with different heating systems, making it difficult to operate and maintain backup supplies. The power supply system with the old control method causes great energy loss.
Therefore, ESEC implemented the project “Upgrading the NOF Plating Furnace heating system” to improve the quality of the power supply system, improve energy efficiency and optimize maintenance.
- Project:
- Upgrade Galvanizing Furnace NOF System
- Customer:
- Hoa Sen Group
- Industry:
- Steel