After nearly a decade of inactivity, the drilling rig’s drive and control systems faced several critical challenges:
- Obsolete and discontinued VFD systems, with no spare parts or OEM support.
- Full system upgrade required within <6 months.
- Seamless integration with NOV Amphion drilling control system.
- High project complexity, with international contractors proposing 8–10 months or declining the project.

